Table Of Contents

Embarking on a painting project within the hospitality industry, particularly for hotels, demands careful consideration and meticulous planning. Not only must the aesthetic align with the brand's image, but the execution must also minimise disruption to operations and guest experiences.

Understanding the full scope and budgeting for such projects are critical to determining their success. This guide will provide hotel owners and managers with vital insights on assessing the scope of their painting projects and strategically estimating the necessary budget. Read on to learn more!

Understanding the scope of your painting project

The scope of a hotel painting project is influenced by several key factors that go beyond the primary choice of colours. First and foremost, area coverage plays a fundamental role in defining the project's extent.

This includes guest rooms, common areas, hallways, exteriors, and speciality rooms such as restaurants and conference spaces. Based on its usage and exposure to elements, each location may require different types of paint and preparation.

The complexity of spaces also affects the scope.

Hotels often feature intricate design elements like high ceilings, detailed mouldings, and bespoke finishes that can complicate the painting process. Additionally, the operational necessity to keep the hotel running smoothly while work is underway means that logistical planning must be precise to avoid disruptions.

Estimating costs: Materials and labour

Accurately estimating the costs of a hotel painting project is pivotal to maintaining budget control and ensuring financial efficiency. The two primary cost components to consider are materials and labour.

  • Materials: The cost of paint and necessary supplies (like primers, brushes, rollers, and drop cloths) can range widely depending on the quality and specific requirements of the project. For example, speciality coatings or paints designed for high durability in high-traffic areas might be more expensive but offer better long-term value due to reduced maintenance needs. To estimate these costs accurately, it is crucial to calculate the total area to be painted and then apply the unit cost of the materials chosen based on the coverage area specified by the manufacturer.
  • Labour Costs: These costs can be the most variable aspect of a painting project, influenced by the complexity and the speed at which the spaces must be turned over. Labour expenses will depend on the size of the team required, the hours needed to complete the project, and the prevailing wages in the region. It is often beneficial to solicit multiple bids from contractors to ensure competitive pricing. Additionally, understanding the detailed breakdown of labour stages, from preparation and setup to painting and clean up, can help negotiate better rates and scheduling efficiencies.

To get the most value from your investment in materials and labour, consider sourcing multiple quotes, using high-quality materials that offer more extended durability and require fewer touch-ups, and planning the project during off-peak periods to negotiate lower labour rates.

Choosing the right paint and materials

Selecting the appropriate paints and materials for a hotel painting project is a critical decision that impacts not just the property's visual appeal but also its long-term maintenance costs and durability. When choosing these materials, several factors need to be carefully weighed:

  • Durability: In a high-traffic environment such as a hotel, the durability of the paint is paramount. High-quality, scrubbable paints that withstand frequent cleaning without losing lustre or colour are ideal. These paints prevent frequent touch-ups, reducing long-term maintenance costs.
  • Aesthetic Appeal: The choice of colours and finishes plays a significant role in defining the ambience of a hotel and can significantly impact a guest's first impression. The paint should complement the hotel's theme and decor. Different finishes (matte, satin, gloss, etc.) offer various sheen levels and can be selected based on the desired aesthetic effect and practical maintenance needs.
  • Eco-Friendliness: With increasing awareness of environmental issues, choosing eco-friendly paints with inferior volatile organic compounds (VOCs) can be a significant draw for guests. These paints contribute to more suitable indoor air quality and are particularly beneficial in enclosed spaces with little ventilation.
  • Cost Efficiency: While higher quality paints might come at a premium, their extended lifespan and reduced need for frequent retouching provide cost efficiencies over time. Investing in premium paints that offer additional protective features like mould resistance or UV protection can further enhance their value proposition.
  • Specific Requirements: Certain paints might be better suited to local conditions depending on the hotel's location. For example, properties near the ocean might benefit from moisture-resistant paints to combat high humidity levels.

Incorporating technology and innovative practices

The painting industry has seen significant technological advancements and innovative practices that can streamline painting projects and enhance efficiency, particularly in the dynamic environment of hotel maintenance:

  • Automated Painting Technology: Innovations such as automated or robotic painters can significantly speed up the painting process while ensuring consistent quality. These technologies are beneficial in large, uniform areas such as hallways or conference rooms, reducing labour costs and project duration.
  • Advanced Paint Formulations: The development of paints with advanced characteristics, such as ultra-fast drying times, superior adhesion, and enhanced durability, can reduce the time rooms are out of commission. For instance, using quick-dry paints allows faster room turnovers, minimising downtime and disruption.
  • Pre-Coated Wallpaper: Pre-coated and customisable wallpapers can be an alternative to traditional painting. These materials offer rapid installation and minimal odour, with durability and an array of aesthetic designs that are quickly interchangeable to keep up with design trends.
  • Digital Colour Matching Tools: Utilising technology to ensure precise colour matching can significantly enhance the efficiency of touch-ups and repaints. Digital tools can analyse the existing wall colour and create a matching paint formula, reducing waste and ensuring consistency across touch-ups.
  • Eco-Efficient Practices: Implementing practices such as reusing materials, properly containing paints and solvents, and recycling can minimise environmental impact and potentially reduce waste disposal costs.

Planning for indirect costs and contingencies

In any hotel painting project, direct costs such as labour and materials are often the primary focus of budgeting efforts. However, the importance of planning for indirect costs and contingencies cannot be overstated. Indirect costs may include disruptions to hotel operations, loss of revenue due to room unavailability, and even potential compensation to guests if the work significantly impacts their stay.

To effectively budget for these, hotel owners should:

  • Assess Operational Impact: Evaluate how painting projects could disrupt hotel operations. For example, painting common areas might reduce the hotel's attractiveness for potential bookings. Calculate the potential revenue loss per day and incorporate this into the budget.
  • Set Aside A Contingency Fund: A contingency budget of 10-20% of the total project cost is recommended to cover unexpected expenses. This fund can address issues such as delays due to weather, additional repairs found during painting, or accelerated schedules to minimise disruption.
  • Insurance and Liability: Ensure that insurance policies cover any damages that might occur during the painting process and verify that contractors have adequate insurance to cover their liabilities. This reduces financial risk in case of accidents or damage.
  • Plan For Guest Relations: Budget for potential guest satisfaction measures, such as discounts or complimentary services, if renovation works impact their experience. This can help maintain good customer relations and protect the hotel's reputation.

Negotiating with contractors

Negotiating effectively with painting contractors is crucial for hotel owners looking to balance cost with quality. Here are strategies to ensure competitive pricing without compromising on the quality of work:

  • Gather Multiple Quotes: Start by obtaining detailed quotes from several contractors. This will provide a benchmark for average costs and help identify too-high or suspiciously low outliers.
  • Understand the Details: Determine what each quote includes regarding materials, labour, time, and additional services like cleanup and minor repairs. This understanding will prevent unexpected charges and provide a solid basis for negotiation.
  • Leverage Long-Term Relationships: If you foresee ongoing or future painting needs, consider negotiating a contract that covers multiple projects. Contractors may offer better rates for the promise of continued business.
  • Negotiate Payment Terms: Consider negotiating payment terms instead of just pricing. For instance, a more significant upfront deposit might lower the overall project cost.
  • Discuss Trade-Offs: Discuss ways to reduce costs if a quote exceeds your budget. This might include using different materials or adjusting the project scope. Ensure that these trade-offs maintain the essential quality or durability of environments.

Ask an expert painter for help in budgeting for the project 

Consulting with a professional painter can provide invaluable insights into accurately budgeting for your hotel painting project. They bring expertise in cost-efficient material selection and precise estimation of labour and time requirements. Their experience allows for a detailed assessment considering all potential variables and contingencies, ensuring your budget aligns with your financial constraints and quality expectations.

PAINT. PROTECT. PRESERVE.

Ready to make a change?
transform your space with avello group!

Contact the professional team at Avello Group to revitalise your commercial space today!

More from Our Blog

You Might Also Like

See All Painting Blog Posts